So its all really happening here, we started to organize multitude of things preparing for our move. Yesterday we had a final walk through with our site supervisor which is basically our last chance before handover to raise any concerns/issues with the works/finishes etc. It took almost 3 and half hours and after that we spent quite a bit of time there taking photos / and just generally absorbing the thought that we will be living in this house in 2 weeks from now. Approximate handover date is expected to be 28th, subject to few other factors. Felt so good to be left alone in our very own sweet home , and my girl was super excited.
We organized curtains, school tours, leaves from work etc, but still a lot of things are pending in terms of preparing for the big move and works at home there after, stressful yet exciting times, and we are sure the stress has just began. This is when we miss both of our loving families :) who would have helped/guided us in everything if they were with us.
All the final touches have gone in except for few cosmetic issues and the master bedroom mirrored robe doors are not installed yet, caz of some supplier issue. Also the stove top, oven, rangehood and hotwater system also are not in, but they would normally install them at handover, as they are expensive items and we risk the house being broken into if they are in there before we occupy the property. But other than that pretty much everything is taken care of and is in good order.
We also raised how they did not leave the left over bricks on site while cleaning the site. Those extra bricks would have been very handy for garden edging and some little planter boxes, which we were planning near front pillars. They did leave the leftover tiles onsite which is good. Lets see what solution they would offer for bricks.
 |
| Ensuite Mirrors gone in |
 |
| Shower screens gone in |
 |
| Kids Bath |
 |
| Linen storage room |
 |
| Stairs |
 |
| Niche downlights fixed... Looks niiiice ..... I am happy |
 |
| Security Alarm installed, we are still can't understand how it would call our mobiles as there is no phone line around it as we originally thought. Husband seriously trying to workout how that thing works at all :) |
 |
| Kitchen |
 |
| Kitchen , other angle, those are left over tiles and should be going to go to garage soon |
 |
| Island bench minus dishwasher |
 |
| Notice that glass splashback around window, not quite happy how it turned out, as the sample we choose at selections was nothing like it, but it look quite OK with those under cabinet downlights reflecting on them, makes the color look lot lighter. |
 |
| Facade , with garage door |
 |
| Kids bathroom mirror, there is a small gap in the shower screen silicone seal to the floor , husband showing that to site super, at the back |
 |
| Living room |
 |
| powder room mirror, small error with its position |
 |
| powder room shower |
 |
| Theater room with carpet and wiring for surround sound system, data, HDMI etc cables |
 |
| Wiring for projector connection |
 |
| Add caption |
 |
| ensuite spa, the bath spout need to be replaced, as it had scratches. The window here was broken which they replaced already. |
 |
| Ensuite from master bedroom , can see the bedhead wall model in the mirror |
 |
| stairs stained , but they did a very sloppy job I would say, we raised it with site manager to get it resanded and stained to get better finish , he agreed to correct it , but only after LOT of arguments unfortunately. We can also see our carpet colour. |